Cost
Estimates

A precise technical and economic calculation of construction, installation, equipment, and transport costs, based on the official regulatory rate base.

Cost Estimates

The Cost Estimate Is the Financial Language of the Project

Cost estimate documentation makes it possible to see the real cost of construction before work begins. It serves as the key document for budget planning, justifying the contract price, preparing tender documentation, and controlling costs during execution. An accurately calculated estimate prevents unexpected expenses from arising during construction.

Calculation Methodology

The scope of works is derived directly from the project drawings — each structural element and each section is measured separately. Each type of work is then matched against the unit prices in the regulatory rate base: material cost, labor cost, and machinery operating costs are accounted for as separate line items. The result is a transparent document showing both the total amount and exactly how it was formed.

Cost estimate documentation is prepared using FHN's licensed software. This ensures that the calculations are presented in an officially accepted format, following a verifiable structure.

Reviewing cost estimate reports

Composition of the Estimate Package

  • Bill of quantities
  • Local estimates
  • Facility estimate
  • Summary estimate report
  • Resource schedule
  • Material specification
  • Equipment and inventory list
  • Transport and machinery costs
  • Demolition and assembly works
  • Additional and contingency costs

When Is It Needed?

  • Preparing a budget for new construction
  • Reconstruction and major renovation works
  • Preparation of tender documentation
  • Justification for investors and banks
  • Audit and review of an existing estimate
  • Preparation of execution documents and acts

Unity of the Project and the Estimate

The accuracy of the estimate depends directly on the quality of the project documentation. Because our company carries out both design and cost estimation work, the two sets of documents are fully aligned with one another: work that is not on the drawings does not appear in the estimate, and work not accounted for in the estimate does not create surprises during construction.

Cost Estimates — Work Stages

01
Quantity Indicators
The type, quantity, and specification of the works are determined
02
Estimate Calculations
Precisely valued based on the regulatory rate base
03
Final Estimate Package
The complete set of documents is formally submitted to the client